PERBAIKAN WAKTU SET-UP DENGAN MENGGUNAKAN METODE SMED (STUDI KASUS PT NAGA BHUANA ANEKA PIRANTI)

Satwikaningrum, Dyaksi (2006) PERBAIKAN WAKTU SET-UP DENGAN MENGGUNAKAN METODE SMED (STUDI KASUS PT NAGA BHUANA ANEKA PIRANTI). Other thesis, Universitas Sebelas Maret Surakarta.

[img] PDF - Published Version
Download (3147Kb)

    Abstract

    PT Naga Bhuana Aneka Piranti is a furniture company that produces garden furnitures, indoor furnitures, and also many kinds of handycrafts. This is done to meet the market demands nowadays. PT Naga Bhuana Aneka Piranti is using mass production as the production system. Now, PT Naga Bhuana Aneka Piranti is producing folding chairs. To meet the demand, PT Naga Bhuana Aneka Piranti needs a finishing time that is suitable for the definite time. The problem that is faced by PT Naga Bhuana Aneka Piranti is the lateness time for finishing the folding chairs so that it does not meet the scheduled plan. The lateness in many departments makes finishing time unsuitable with the definite schedule. Because of the problem, PT Naga Bhuana Aneka Piranti should reduce the set-up time to solve the problem of lateness in finishing the folding chairs. Reducing set-up time can be done by using Single-Minute Exchange of Die (SMED) method. The SMED method separates set-up time activities to become two activities, which are internal set-up and external set-up. Internal set-up is an activity that is only done when the machines are not operated. External set-up is an activity that can only be done when the machine is being operated. By changing internal set-up to become external set-up, then the set-up activities that is done when the machine is stopped can be done when the machine is operated so the time for the set-up can be minimized. The result of data analysis shows that by the application of SMED method, the set-up time of the production of folding chairs for each station can be reduced up to 11.23 minutes/ day. The set-up time for each station before SMED application was 67.73 minutes/ day, and after SMED application, it can be reduced to 56.5 minutes/ day. The time saving for the set-up can add the company income up to Rp. 6.360.000,00/ month. Key words : SMED method, set-up time, external set-up, internal set-up.

    Item Type: Thesis (Other)
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Fakultas Teknik
    Fakultas Teknik > Teknik Industri
    Depositing User: Riza Umami Nur K
    Date Deposited: 17 Jul 2013 16:31
    Last Modified: 17 Jul 2013 16:31
    URI: https://eprints.uns.ac.id/id/eprint/5660

    Actions (login required)

    View Item