Evaluasi Perkerasan Jalan, Pemeliharaan dan Peningkatan dengan Metode Analisa Komponen beserta Rencana Anggaran Biaya (RAB) Ruas Jalan Daleman - Pakis KM 0+000 – 2+100

PANDEGA, HUDOYO WAHYU (2017) Evaluasi Perkerasan Jalan, Pemeliharaan dan Peningkatan dengan Metode Analisa Komponen beserta Rencana Anggaran Biaya (RAB) Ruas Jalan Daleman - Pakis KM 0+000 – 2+100. Other thesis, Universitas Sebelas Maret.

[img] PDF - Published Version
Download (203Kb)

    Abstract

    ABSTRACT Hudoyo Wahyu Pandega, 2016. An evaluation on road hardening, maintenance, and improvement using component analysis method with expense budget plan in Daleman - Pakis Road km 0+000 – 2+100. Final Project, Transportation Civil Engineering Undergraduate Program, Civil Engineering Department of Engineering Faculty of Surakarta Sebelas Maret University. Highway is the land path on the surface of earth made by human being with its forms, sizes and construction types so that it can be used to distribute human, animal and vehicle traffic transporting goods from one place to another easily and quickly. The observation was conducted on Daleman - Pakis Road in 2,1 km length aiming to conduct an evaluation on road condition using Pavement Condition Index (PCI) method by dividing the road into several segments with 50 m interval. Then, every segment of road was observed (visually) and measured to identify the types of damage existing and assessed corresponding to PCI method. From the result of observation, the types of damage included Alligator Cracking, Bleeding, Longitudinal Cracking, Patching, Potholes and Stripping. These damages only occurred in some segments and the repair was conducted based on the types of damage existing. It included fracture filling, local asphalt washing, sand spreading, and patching. Corresponding to the estimation of traffic density volume and soil supportability, layer thickness redesigning was conducted according to the planned age, 10 years. The hardening material used was LASTON Ms. 744. Then, from entire work, the total cost needed in the attempt of repairing and improving quality in Daleman - Pakis Road km 0+000 – 2+100 in 2016 was IDR 5.276.680.881,06 Keywords: Pavement Condition Index (PCI), LASTON.

    Item Type: Thesis (Other)
    Subjects: T Technology > T Technology (General)
    T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Fakultas Teknik
    Fakultas Teknik > D3 - Teknik Sipil
    Depositing User: Sofi Wildan
    Date Deposited: 06 Apr 2017 17:34
    Last Modified: 06 Apr 2017 17:34
    URI: https://eprints.uns.ac.id/id/eprint/33354

    Actions (login required)

    View Item