Keterkaitan Antara Tenaga Kerja dan Produktivitas pada Perusahaan Furniture: Studi Kasus CV Total Teak

P, AZHAR NAJIB ARRAID (2017) Keterkaitan Antara Tenaga Kerja dan Produktivitas pada Perusahaan Furniture: Studi Kasus CV Total Teak. Other thesis, Universitas Sebelas Maret.

[img] PDF - Published Version
Download (668Kb)

    Abstract

    ABSTRACT THE RELATIONSHIP BETWEEN EMPLOYMENT AND PRODUCTIVITY IN THE FURNITURE COMPANY: A CASE STUDY OF CV TOTAL TEAK AZHAR NAJIB ARRAID.P F3113009 The purpose of this study is to examine the labor productivity of the CV Total Teak as one of furniture company. The method used in this research is the descriptive method. The type of data collection being used are the primary data and secondary data. The primary data was obtained directly from interview with CV Total Teak staff, while for secondary data was obtained through literature review that deals with the problems examined. The result of the research shows that the production of CV Total Teak has not been able to fulfill the number of orders. In order to fulfill buyer’s order CV Total Teak requires volume employees (outsourcing). CV Total Teak shall employed productivity measurement method to calculate the number of labor more efficient. Key Words: Labor, Productivity, Outsourcing.

    Item Type: Thesis (Other)
    Subjects: H Social Sciences > HB Economic Theory
    Divisions: Fakultas Ekonomi
    Fakultas Ekonomi > D3 - Manajemen Perdagangan
    Depositing User: Nanda Rahma Ananta
    Date Deposited: 22 Mar 2017 09:22
    Last Modified: 22 Mar 2017 09:22
    URI: https://eprints.uns.ac.id/id/eprint/32046

    Actions (login required)

    View Item