ANALISIS KINERJA ANGKUTAN UMUM PERKOTAAN JALUR 03 DAN 04 DI WILAYAH SURAKARTA

DIAN P, FEBRIAN (2016) ANALISIS KINERJA ANGKUTAN UMUM PERKOTAAN JALUR 03 DAN 04 DI WILAYAH SURAKARTA. Other thesis, Universitas Sebelas Maret.

[img]
Preview
PDF - Published Version
Download (21Kb) | Preview

    Abstract

    The problems of public transportation in Surakarta is about how low the service level in the infrastructure section, the travel took a quite long time, overlapping between routes. Urban transportation on route 03 and 04 have a route which overlapping with the route of BST, the route 03 overlapping with BST corridor 3 and route 04 overlapping with BST corridor 5. It usually affect the number of passengers and income of the both route. This study examines the information of service performance on urban public transport in route 03 and 04 at Surakarta area, viewed from the aspect of headway, the waiting time of passengers, travel speed, travel time, availability, load factor and operating ratio by using the standard Performance Indicators Services Public Transport according to Department of Indonesian Transportation and Public Transportation Performance Indicators which refers to the World Bank standard. This research method using descriptive analytical, it is not experimental and intended to collect the required data (in the form of primary data and secondary data) relating to the research, then these data will be analyzed. The primary data is in the form that contains the number of passengers, travel time, headway and operating cost data to calculate the operating ratio. Secondary data were obtained from the Transportion Department of Surakarta city, in the form of supporting data that are useful for analyzing occurred problems. The analysis showed that the performance of public transport at route 03 and 04 are not entirely meet the standards of the specified indicators. The standards Transportation for route 03 shows that the travel speed indicator and headway indicator has meet the standards, but the travel time still not meet the standards. For route 04 it shows that the headway indicator, travel speed indicator and travel time indicator has meet the standards. Then for the indicators refers to the standard World Bank, route 03 has meet the indicator of headway and travel speed, but the indicator of availability, load factor and operating ratio still not meet the standards. For route 04, headway indicator, travel speed indicator and operating ratio indicator has meet the standards, but the availability and load factors still not meet the standards. Keywords : Urban transport, public transport, performance, operating ratio, load factor

    Item Type: Thesis (Other)
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Fakultas Teknik > Teknik Sipil
    Depositing User: satria mahendra
    Date Deposited: 10 Apr 2016 18:16
    Last Modified: 10 Apr 2016 18:16
    URI: https://eprints.uns.ac.id/id/eprint/24416

    Actions (login required)

    View Item