    ABSTRACT Arthe Marbiyono, 2015. Evaluation of Pavement Maintenance and Enhancement Component Analysis Method along with the Budget Plan (RAB) Roads intersection Songgo Sukoharjo KM 0+000- 2+400. Final, Diploma Program Civil Civil Engineering, Faculty of Engineering, Surakarta Sebelas Maret University. Songgo fork in the road segment Sukoharjo a collector roads III class B with the type of flexible pavement and has a width of 5 m. This road is the main link between the village and the village Klerong Jatipuro. Type of vehicles through the road segment consists of motorcycles, cars and large trucks to treiler. The observations made on road intersection Songgo Sukoharjo km 0+000 - 2+400 with a length of 2.40 km road is aimed to assess road conditions by using the method of Pavement Condition Index (PCI) by dividing the road into several segments, namely every 50 m. Then, every road segment was observed (visually) and measurements to identify the type of the damage and make an assessment in accordance with the PCI method. From the observation values obtained classified PCI 64.54 Medium "Fair" with the type of damage in the form of Alligator Cracking, Bleeding, Long and Trans Cracking, Potholes Count and Weather / raveling. The damage in some segments only and do repairs based on the type of damage that exist, namely by filling cracks, laburan local asphalt, sand stocking and filling. According to the calculation volume of traffic density, CBR value of 90% of 5.2% and 4.78 soil bearing capacity planning is repeated with a thick layer of 6 cm thick in accordance with the design life of 10 years. Pavement materials used are Laston Ms.744. Then of the entire job is obtained the total cost required in business improvement and quality improvement at Jalan Pertigaan Songgo Sukoharjo km 0+000 - 2+400 2015 is Rp.3.122.409.669,93. Keywords: Pavement Condition Index (PCI), Laston, RAB.

    Item Type: Thesis (Other)
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Fakultas Teknik
    Fakultas Teknik > D3 - Teknik Sipil
    Depositing User: fransiska siska meilani
    Date Deposited: 02 Oct 2015 11:55
    Last Modified: 02 Oct 2015 11:55
    URI: https://eprints.uns.ac.id/id/eprint/20038

    Actions (login required)

    View Item