Minimasi Slack Time pada Penjadwalan Make To Order Job Shop

Parkhan, Ali and Tanjung Adi, Hermawan (2005) Minimasi Slack Time pada Penjadwalan Make To Order Job Shop. Performa, 4 (2). pp. 107-116.

[img] PDF - Published Version
Download (517Kb)


    In manufacturing Make to Order environment, order usually can be negotiated in order to satisfy customer need while it remains considering resources availability. Scheduling is utilized in a company to get higher efficiencies in production, minimize makespan and meet due date. There are some decisions related in scheduling activity i.e. sequencing, routing and determining starting time and finishing time of jobs. This paper will present application of Integer Linear Programming (ILP) and Critical Path Method (CPM) in scheduling. The methods are employed to determine due date that minimize slack time. This study resulted an optimal sequencing and routing of the jobs. Keywords : make to order, due date, slack time.

    Item Type: Article
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Fakultas Teknik
    Fakultas Teknik > Teknik Industri
    Depositing User: Budianto Erwin
    Date Deposited: 09 Jul 2013 19:43
    Last Modified: 09 Jul 2013 19:43

    Actions (login required)

    View Item