Model Penjadwalan Pekerjaan pada Flowshop dengan Kriteria Minimasi Total Waktu Tingal Aktual

Yuniaristanto, (2002) Model Penjadwalan Pekerjaan pada Flowshop dengan Kriteria Minimasi Total Waktu Tingal Aktual. Performa, 1 (1). pp. 20-25.

[img] PDF - Published Version
Download (92Kb)

    Abstract

    This paper proposes a scheduling model to determine a sequence of the jobs processed in flowshop. The objective for the model is to minimize total actual flow time accomodating the condition that jobs to be processed arrive at the shop at any times when needed and he condition that the completed jobs be delivered at a common due-date. A heuristic algorithm searching the best solution from the resulting feasible solution has been developed The numerical experience showing the characteristic of the problem is also presented. Keywords :scheduling, heuristic, acutal flowtime:

    Item Type: Article
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Fakultas Teknik
    Fakultas Teknik > Teknik Industri
    Depositing User: Users 828 not found.
    Date Deposited: 09 Jul 2013 00:47
    Last Modified: 09 Jul 2013 00:47
    URI: https://eprints.uns.ac.id/id/eprint/1222

    Actions (login required)

    View Item