Optimasi Rencana Produksi Menggunakan Model Matriks Transportasi Bowman (Studi Kasus di PT. X, Magelang)

Taufiq, Rochman (2002) Optimasi Rencana Produksi Menggunakan Model Matriks Transportasi Bowman (Studi Kasus di PT. X, Magelang). Performa, 1 (1). pp. 26-34.

[img] PDF - Published Version
Download (121Kb)

    Abstract

    Production planning is an important activity of the whole production activity in the company. Planning stage is the first step be done to make production decision. Production planning with Bowman Transportation Method is planning model that matching between demand, capacity, inventory level and production cost. Advantage of this model is to determine production schedule with balancing between production variables and minimum total production cost. Keywords : Production planning, Bowman matrix, Linier programmning.

    Item Type: Article
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Fakultas Teknik
    Fakultas Teknik > Teknik Industri
    Depositing User: Users 828 not found.
    Date Deposited: 09 Jul 2013 00:47
    Last Modified: 09 Jul 2013 00:47
    URI: https://eprints.uns.ac.id/id/eprint/1201

    Actions (login required)

    View Item