STUDI KOMPARATIF PENJADWALAN PROYEK KONSTRUKSI REPETITIF MENGGUNAKAN METODE PENJADWALAN BERULANG (RSM) DAN METODE DIAGRAM PRESEDEN (PDM)

Laksito, Budi (2016) STUDI KOMPARATIF PENJADWALAN PROYEK KONSTRUKSI REPETITIF MENGGUNAKAN METODE PENJADWALAN BERULANG (RSM) DAN METODE DIAGRAM PRESEDEN (PDM). MEDIA TEKNIK, 5 (2). pp. 85-91.

[img] PDF - Published Version
Download (249Kb)

    Abstract

    Repetitive project activities require scheduling instrument which can facilitate unbreakable resources flow from one to the next unit. CPM which has been widely recognized as a tough project scheduling method to handle complex and has many branchesl networks, apparently become less effective if we used it to schedule repetitive project. Like wise the PDM usefulness in a project relatively collided with it’s limited ability to maintain work continuity for existing worker teams.What we want to inform in this paper is introducing a new alternative method that is RSM . RSM is a method that guarantee the unbreakable resources usage, also applicable for both repetitive vertical and horizontal project. Considered from the expense of total labor fee, RSM are more cost-saving than PDM if the labor arrangement is adapted to work specialization

    Item Type: Article
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Fakultas Teknik > Teknik Sipil
    Depositing User: Users 853 not found.
    Date Deposited: 11 Jul 2013 12:55
    Last Modified: 17 Mar 2017 12:10
    URI: https://eprints.uns.ac.id/id/eprint/1032

    Actions (login required)

    View Item